PROJECTS

Complete Rooftop Playground Install

This was a complete rooftop playground flooring solution in New York City. We installed “surface mount” equipment (as seen in the photos below). This equipment is the same as you would see on any typical playground, just installed a different way due to the fact that it is installed on a rooftop. We coordinated with a lifting solutions company to get all materials on the rooftop. Playground equipment, playground rubber tiles… everything. This company insures that all necessary permits and flag people are in place, as required by the location. Each of the five boroughs in New York has its own requirements for this (of course), but it is all factored into the project and not the responsibility of the building owner. Read More +

Playground Designer Day Care Project

We often work with Playground Designers and Professional Landscapers to bring their playground surface design ideas to life. This project is a perfect example of a collaboration with a Playground Designer and a Playground Equipment Manufacturer. Read More +

New Apartment Complex Playground Surface

This brand new apartment complex located in Germantown, Wisconsin, also needed a playground. adventureTURF worked with the contractors who were building the entire project. We were able to help determine the color and layout of the new playground location in the common area of the complex. Read More +

Expanding an Existing Playground Surface

The Village of Allouez (near Green Bay, Wisconsin) asked adventureTURF to add an extension to their current play space with a playground surface expansion. Optimist Park hosts The Allouez Optimists Miracle League of Green Bay. This league provides kids with mental and/or physical challenges, an opportunity to play baseball as a team member, with real uniforms, in an organized league, regardless of their capabilities. The playground area, which is called The Favre Family Miracle Recreation area offers a handicap-accessible playground. Incidentally, the playground is named after its major contributors, Deanna and Brett Favre (of the Green Bay Packers).
Read More +

Military Base Playground Poured Rubber Surface Installation

The Fort Drum Military Base is home to the 10th Mountain Division of the U.S. Army. According to the base, “More than 15,000 military service members and about 3,700 civilian personnel (including contractors) work at Fort Drum, with about 15,000 Family Members living on post or in the local area.” The base offers child care and recreational programs for children including playgrounds. Read More +

Park Playground Resurfacing Project

One of the great benefits to having a poured rubber surface on your playground is that it can easily be repaired or resurfaced in the future. While poured rubber is a long-lasting, virtually maintenance free surface for all playgrounds, it doesn’t last forever. Read More +